While the Crude Oil tanker, was anchored by the Dutch coastline, we conducted maintenance on one of the auxiliary engines. We performed a 24,000-hour check on the engine.
We changed the bearing brush, honed the inner lining and did an inspection and cleaning of allessential parts. After that, we tested the engine, so it was ready for the following 24,000 hours. We had two weeks to solve the task but completed it in just 10 days.
<iframe width="600" height="338" src="https://www.youtube.com/embed/dxvjOzb6uzY" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>